What Is a Mandatum Preliminary Project? Principles, the 3 Pillars and 2 Layers, and the Method

by hbmadero | Oct 30, 2026 | Order | 0 comments

Before the Order commits large resources to a community, it writes a preliminary project, an anteproyecto. It is the document that lets the Council of the Order, its allies and the authorities decide, with enough information, whether a project should go ahead, be adjusted or be set aside.

An anteproyecto describes, with enough detail and evidence, what is being proposed, why, where, for whom, how, how long it will take, how much it will cost and how it will sustain itself over time. Its job is to make an informed decision possible: approve, adjust or reject the proposal before larger resources are committed. This article explains how Mandatum understands it, the principles behind it, the model it uses to design communities and the method it follows.

ANTEPROYECTOdecide beforespendingWhat?Why?Where? For whom?How?How long?How much?APPROVE · ADJUST · REJECTSUSTAINED OVER TIME?
The questions every anteproyecto must answer.
Key concept · DefinitionThe Mandatum anteproyecto is the comprehensive, well-founded proposal for a community intervention, prepared according to the Mandatum Method, that allows the Council of the Order, its allies and the authorities to decide, with sufficient information, whether the project should move on to the detailed-design stage.
The project ladder

A project goes through several levels of maturity. Confusing them is one of the most common mistakes.

IDEAIDEA SHEETANTEPROYECTODETAILED DESIGNWorth a look?Worth studying?Should we do it this way?How do we build it?1 p.2–4 pp.25–60 pp.+ annexes100s of pp.THE DECISION POINT
Each step costs more than the one before. The anteproyecto is where the decision is made.
LevelWhat it isQuestion it answersLevel of detail
IdeaAn intuition or an opportunityIs it worth a look?One page
Profile or idea sheetA short description of the problem and a possible responseIs it worth studying?2 to 4 pages
Preliminary projectA comprehensive proposal with diagnosis, design, costs, sustainability and risksShould we do it this way?25 to 60 pages plus annexes
Detailed designDrawings, specifications, contracts, works scheduleHow exactly do we build it?Hundreds of pages

The anteproyecto sits at the right point: deep enough for a serious decision, but far less costly than a detailed design. That is why it is said to save money. It spots unviable projects in time and corrects viable ones before anything is spent on drawings and contracts.

What it is for
1DecideThe Council of the Order approves or rejects on the basis of the anteproyecto.
2Secure fundingNo serious foundation funds an idea; it funds a well-supported proposal.
3NegotiateThe agreement with the municipality or government is signed on a clear document.
4Align the teamEngineers, educators and field coordinators work from the same document.
5Be accountableYears later, it lets us compare what was promised with what was achieved.
Note · What an anteproyecto is notIt is not a brochure, a letter of good intentions or a wish list. If a statement cannot be checked, if a figure has no source or a cost has no calculation, the document loses its credibility entirely, not just on that point.
Who takes part
COUNCIL OF THE ORDERapprovesOFFICE OF PRELIMINARY PROJECTSProcuratorate of Projects · preparesFinanceDiplomacyCommunicationsSystemsCommunity
Prepared by the Office of Preliminary Projects with the procuratorates and the community; approved by the Council.

Within Mandatum, the anteproyecto is prepared by the Office of Preliminary Projects of the Procuratorate of Projects, with support from the other procuratorates (Finance, Diplomacy, Communications and Systems) and, above all, with the participation of the community. It is approved by the Council of the Order.

The principles behind every anteproyecto

The Mandatum Method is more than a technique. It rests on principles that set apart the way the Order acts. A preliminary project that does not respect them may be well written and still not be a Mandatum anteproyecto.

1Communities, not just housesA single house solves a roof; a community solves a life. Every anteproyecto includes, besides housing, everything the community needs to develop: education, work, shared values and security.
2Quality, not charityCharity hands something over and leaves. Families take part and contribute, through an affordable social fee, their work and their commitment to the code of conduct. The contribution is not a price: it is dignity and shared responsibility.
3Education is the pathEducation is the only possible path to lasting social growth. A good school and a trades centre are the engine of the project; they also bring jobs and train the people who will run small businesses.
4Sustain until self-sustainingThe funds cover construction and the support of the community until it reaches break-even and can finance itself, usually about ten years: one generation. No sustainability plan, no anteproyecto.
5A clear relationship with the StateNo money, debt or financial commitments are asked of the State. Mandatum asks for four things: stability; support during the State's controls and audits; freedom to choose suppliers; and that the direction of the project remain with Mandatum.
6Security without replacing the StatePrivate and electronic security, but no police powers. Crimes are reported to the police under local law. Mandatum is democratic by conviction and does not take the place of the State.

“We do not build houses: we form a community that sustains itself.”Institutional principle

Year 0Year 5Year 10ConstructionSupport of the communitySelf-financingAbout one generation
Principle 4: the funds sustain the community until it can sustain itself.
Key concept · A quick alignment testBefore going ahead with any proposal, answer five questions. If any answer is “no”, the design has to be corrected.
  1. Does it form a community, or does it only build?
  2. Does it require shared responsibility?
  3. Does it put education at the centre?
  4. Does it have a ten-year plan?
  5. Does it respect the right relationship with the State?
The 3 Pillars and 2 Layers model

So that no essential element is left out, Mandatum organizes every community around a model that is easy to remember: three pillars that hold up material life and two layers that surround it and give it cohesion.

LAYER · SECURITY AND THE RULE OF LAWPrivate and electronic security · coexistence committee · coordination with the policeLAYER · VALUESCommunity centre · chapel · code of conduct · civic and family formationHOUSINGEDUCATIONWORKA decent, safehome with servicesTrainingto growSteady incomeof one's ownTHE COMMUNITY
Three pillars hold up material life; two layers surround it and give it cohesion.
PillarWhat it solvesExample components
HousingA decent, safe home with servicesExpandable homes, water, sanitation, energy, streets
EducationTraining to growPrimary and secondary school, trades centre, adult education
WorkSteady income of one's ownSmall businesses, cooperatives, microcredit, jobs on the building site

The three pillars reinforce each other. A home gives the stability needed to study; education prepares people for work; work makes it possible to pay the housing fee. If one pillar is missing, the other two weaken.

HOUSINGWORKEDUCATIONstability to studyprepares for workpays the housing fee
If one pillar is missing, the other two weaken.
LayerWhat it bringsExamples
ValuesIdentity, coexistence and a sense of belongingCommunity centre, chapel, code of conduct, civic and family formation
Security and the Rule of LawProtection and respect for the lawPrivate and electronic security, a community coexistence committee, coordination with the police

The layers are not built like a wall: they are cultivated. But they also have physical components, costs and people responsible for them, so they appear in the anteproyecto with the same rigour as the pillars.

Fictional example · A first sketch of Nueva AuroraNueva Aurora is not a real project: it is a fictional example the Academy uses to teach the method. With the model in mind, the team sketches it out:
HHousing240 homes of 52 m², expandable to 70 m²
EEducationMandatum Nueva Aurora School (420 pupils) and a Trades Centre
WWorkSmall Business Park, Construction Cooperative, Microcredit Fund
VValuesCommunity Centre, chapel, Code of Conduct
SSecurityAccess control, cameras, Coexistence Committee, local police

It is only a sketch. Later stages test whether each component is justified by the diagnosis and whether it can be paid for and sustained.

Common mistake · Designing first, diagnosing laterThe 3P+2L model is a checklist, not a recipe. Every component has to answer a need confirmed in the diagnosis. If the community already has a good school nearby, the Education pillar may consist of scholarships and transport rather than a new building.
The six stages of the Mandatum Method

The Mandatum Method organizes the work into six stages. Each one produces concrete results that feed the next and, in the end, come together in the anteproyecto document.

IIIIIIIVVVIUnderstandListenDesignCost & sustainGovern & protectWrite & presentIdea sheetAlignment testDiagnosisBaseline · actorsLogical framework3P+2L · designBudget10-year planGovernanceRisk matrixFinal documentTo the Councilit is normal to go back: too expensive → redesignFROM MANDATE TO APPROVAL
Six stages, followed in order but iterative.
StageCentral questionMain outputs
I. Understand the mandateWhat are we being asked, and under which principles?Idea sheet, alignment test
II. Listen to the communityWhat is the reality, and what do people need?Diagnosis, baseline, stakeholder map, problem tree
III. Design the communityWhat will we achieve, and with which components?Objectives, logical framework, 3P+2L components, physical design
IV. Cost and sustainHow much does it cost, and how is it sustained for ten years?Investment budget, sustainability plan, sources of funds
V. Govern and protectWho decides, who are our allies, and what can go wrong?Governance, agreements, schedule, risk matrix
VI. Write and presentHow do we communicate it so it is approved?Final document, executive summary, presentation to the Council
The official structure

Every Mandatum anteproyecto follows the same twelve-section structure, so the Council and donors always know where to find each piece of information. The map below shows which stage of the method produces each section.

IIIIIIIVVVI1 · Cover and technical sheet2 · Executive summary3 · Context and diagnosis4 · Justification and alignment5 · Objectives and results (logical framework)6 · Components: 3 Pillars and 2 Layers7 · Location and physical design8 · Phases and schedule9 · Investment budget10 · Ten-year sustainability plan11 · Governance, alliances and risks12 · Indicators and evaluation
Twelve sections, plus annexes: surveys, maps, calculations, letters of support and photographs.

Stage VI brings everything together, writes sections 2 and 12 and prepares the presentation. The executive summary is written last, even though it appears near the beginning. The stages are followed in order, but they are not sealed compartments: the budget may show that the design is too expensive and force an adjustment, or a risk found in stage V may call for new diagnostic data. A good analyst is not afraid of going back; a good analyst is afraid of presenting an inconsistent document.

The team
DIRECTORpresents to the CouncilANALYSTFIELD COORDINATORTECHNICAL ADVISERSdrafts, calculates, checkson the ground, daily contactengineering, finance, lawCOMMUNITY · validatesPROCURATORATES · review
Who does what in an anteproyecto.

In the fictional Nueva Aurora example, all names are invented: the team is led by Commander Tomás Ibarra, director of the Office of Preliminary Projects, with a field coordinator, an engineering adviser, a neighbourhood leader and the town's mayor as the institutional counterpart.

The ethics of the analyst

A preliminary project puts the name of the Order and the hopes of many families on the line. Whoever prepares it takes on concrete ethical commitments:

1TruthfulnessNever invent or “round up” data, figures or testimonies.
2SourcesSay where every important piece of data comes from.
3PrudenceNever promise what is not yet approved or funded.
4RespectTreat every person with dignity; never make their situation a spectacle.
5ConfidentialityProtect the personal data of the families surveyed.
6ImpartialityApply public selection criteria, without favouritism.
7TransparencyReport the project's risks and limits clearly.
Note · Expectations are a risk tooEvery visit to the community raises hopes. If the team speaks as though the project were already approved, a refusal by the Council or a delay in funding will turn into frustration and lost trust. The rule is simple: talk about a study, not a promise, until the project is approved and funded.
Written with the community

A Mandatum anteproyecto is not written about the community but with it. The community takes part in the diagnosis, gives its opinion on the design, knows the selection criteria and takes on commitments. This participation is not a formality: it is the best guarantee that the project answers real needs and that, after ten years, the community will be able to run itself.

Glossary
TermMeaning
Preliminary projectA comprehensive, well-founded proposal used to decide whether a project moves on to detailed design
Idea sheetA short document describing the problem and a possible response, used to decide whether it is worth studying
Detailed designThe drawings, specifications and contracts needed to build
3 Pillars and 2 LayersMandatum's model: Housing, Education, Work; Values, Security and the Rule of Law
Social feeAn affordable monthly contribution from each family, expressing shared responsibility
Break-even pointThe moment when the community's own income covers its operating costs
Self-financingThe community's ability to sustain itself without outside contributions
Alignment testA check that a proposal respects Mandatum's principles
Office of Preliminary ProjectsThe unit of the Procuratorate of Projects that prepares the anteproyectos